Breaking news Borehole Lui Hospital
Today the drilling was done for water. Water has been tapped at a depth of 115 m. It went without any problems, thanks to the good geological research of CUAMM, the underground rocks were avoided.
We would like to install ceilings in the classrooms of the Pietro Boschetti School. Ceilings serve as insulation for both sound and temperature.
We would like to do something about the noise nuisance caused by the heavy rainfall. You just don’t have system ceilings here, which is why we went looking for an alternative method.
The plan is to make a concrete ceiling with a wooden frame as a base. This technique is currently also being used in the newly built delivery clinic of the Lui Hospital.
We are currently making an inventory of the costs of such a ceiling system. As soon as we have more information about this you will be the first to hear it!